Because the M007 sensors are fitted In-Line the production at the installation point must be stopped to allow installation.  The time required to stop the line will depend upon the complexity of the installation and any required interface with the mill PLC but in all cases our engineers work to ensure any disruption is minimized.

Posted in: Moisture Measurment & Control